Construction all risk insurance in Finland – contract works, surrounding property and plant

Construction all risk insurance (rakennus- ja asennustyövakuutus) pays for sudden physical damage to the works while they are being built or installed, for example a fire, a burst pipe, a storm or a collapse. It usually does not pay for redoing a part that was built wrong, nor for delay, lost profit or liquidated damages.

Construction claims often turn less on what happened on site than on what the policy schedule lists as the works, and on whether the existing building around the works was insured at all. This is where we often see disputes with the insurer begin.

  • Is the damaged part of the building the works or surrounding property?
  • Was the refusal for defective workmanship correct under your wording?
  • Does an annual or a single project policy fit your contracts?
The cover

What construction all risk insurance covers

Construction all risk insurance covers sudden and unforeseen physical damage to the works named in the policy schedule during the contract. The works mean what is included in the contract price, such as the work itself, the materials on site, the machines and equipment being installed and temporary structures.

The insurance follows the works rather than the company. The cover for a building ends when it is handed over to the client. When a company builds for itself, the cover ends when the building is completed, at the latest when it is taken into use. The start depends on the wording. Pohjola’s wording, for example, insures materials once they are being unloaded or have been unloaded at the site, while LähiTapiola’s and Turva’s cover begins when the risk passes to the policyholder at the site.

Anything outside the works is usually insured only if it is written in the policy schedule. That applies to the contractor’s own tools and scaffolding, site huts, the employees’ tools, expediting costs (the extra cost of speeding up a repair, such as overtime and urgent deliveries) and, in several wordings, the existing property around the works. The schedule therefore tells you more about your cover than the name of the policy.

The sum insured for a single contract is usually the contract price. Most wordings are not limited to named perils, so any sudden physical damage to the works is covered unless an exclusion applies. Some insurers build the cover from named parts instead. LähiTapiola and Turva, for example, combine fire, natural events, leak and crime cover with a breakage cover that pays for other sudden damage. Their construction policy can also be taken out in a narrower form, for example against fire only.

Contract works insurance – the works under construction

Contract works insurance is the British name for construction all risk insurance. The name describes what the main cover insures, the building or structure under construction. In a renovation the works are the parts the contract covers, not the whole building, so a contractor renewing a bathroom has insured the bathroom work but not the flat below it.

Erection all risk insurance for installation work

Erection all risk insurance covers machines and equipment while they are being installed and test run. In Finland it is the same policy as construction all risk insurance. Finnish insurers sell construction and installation cover under one name. For installation work the cover usually ends when the machine is handed over or taken into production use after the test run.

Example · one leak on a renovation site, three answers
  • New pipework and finished surfaces in the flatDamage to the works. Construction all risk insurance pays the repair, less the deductible, if the leak was sudden.
  • The ceiling of the flat belowSurrounding property. Paid from the construction policy only if surrounding property is insured, or from your general liability insurance (toiminnan vastuuvakuutus) if your company is liable for the leak.
  • The badly fitted joint that caused the leakDefective workmanship. Neither policy pays for refitting the joint itself.
Who insures

Who takes out contractors all risk insurance on a Finnish site

The main contractor takes out contractors all risk insurance on a Finnish site when the contract applies the General Conditions for Building Contracts YSE 1998 without changes. The insurance then has to cover the subcontracts too.

YSE 1998 is the standard set of contract terms for Finnish building contracts. Many smaller projects, however, do not agree on applying it or depart from its insurance terms. In those contracts the duty to insure can sit with the client, the main contractor or each contractor for its own part, so check from the contract who must insure what before the work starts.

A subcontractor working under a main contractor’s policy is usually insured too. Fennia’s wording, for example, says that the policy is also valid for the client and the subcontractors. Pohjola, for its part, tells its customers that a main contractor can insure everyone taking part in the contract. A subcontractor that takes out a policy of its own insures only its own share.

A clause in the subcontract does not necessarily relieve the subcontractor’s own liability insurer of the claim. In case FINE-011723 of the Insurance Complaints Board (FINE), an employee of a plumbing and heating subcontractor caused a water leak on site. The subcontract said that the main contractor had to insure the site under a construction all risk policy, so the subcontractor’s liability insurer refused even to handle the claim.

The Board found that the clause limited the subcontractor’s liability only for damage that the construction policy would have paid. It recommended that the liability insurer handle the claim under its own wording.

Foreign clients may ask for the policy in joint names and for a waiver of subrogation, which stops the insurer from claiming its payment back from the contractors. Finnish insurers can grant both as additional covers agreed with the insurer. How they grant them depends heavily on the size of the customer relationship. For a small, newly started company it is very unlikely that the insurer will write them.

The decisive line

The works or the surrounding property – where most claims are decided

In our experience construction all risk claims are often decided by whether the damaged property was part of the works or surrounding property. The works named in the schedule are insured, while surrounding property, such as the existing building in a renovation, is often insured only by a separate entry in the policy schedule.

The wordings differ clearly on this point. Some include a small amount of surrounding property without a separate entry. LähiTapiola and Turva, for example, include it up to 10,000 euros within the sum insured for the works. In others, for example Fennia’s and Pohjola’s, the existing property outside the contract is covered only when it has been agreed. Where the wording has a surrounding property cover, the damage must result from the construction or installation work. The cover also pays only what no other insurance pays.

If the surrounding property was not insured, damage to the flat below or the work area next door can be left without any compensation from the construction policy. Your general liability insurance pays for damage to surrounding property only if your company is liable for it. The liability wordings also usually exclude the property your company is working on.

The same dispute arises over what counts as the works. In a dispute we handled, a subcontractor renovating a flat in a 1930s block chiselled open the tops of six floor beams instead of drilling through them as the plans required. The steel reinforcement inside the beams broke. The insurer refused the claim because it treated the beams as uninsured surrounding property.

FINE-71695-M7J5C42025

F Oy’s subcontractor broke the steel reinforcement of six floor beams in a flat renovation. Compensation was sought under F Oy’s own construction all risk insurance. The dispute was whether the beams were part of the insured works or surrounding property that had not been insured.

Lesson

The Board held that the works cannot be read so narrowly that the cover would apply only to flawless work. The beams were part of the works as a whole. The Board recommended paying their repair together with the propping needed to stop the floor collapsing.

Changed

The Insurance Complaints Board took that view after our appeal. F Oy had claimed over 40,000 euros for repairing the beams. The recommendation also covered the propping built in the flat below, which the insurer had refused as a cost of protecting uninsured property.

When surrounding property is insured, the dispute moves to how far the work area reaches. The Board has held that this depends on the nature of the work and the effects that can be foreseen from it.

VKL 250/152016

A Oy, the main contractor, was renewing the roof of an office building when water damaged the ceilings and walls of the offices below. Compensation was sought under A Oy’s own construction all risk insurance. The dispute was whether the office interiors were surrounding property within the work area.

Lesson

Removing an old roof can harm the whole building, so the offices under it were surrounding property within the effects of the work. The insurer had limited the cover to the structure directly under the roof. The Board recommended paying for the interiors.

Changed

The damage still has to come from the work. In FINE-037229 heavy rain flooded the city sewer. The water entered a housing company’s building through openings that the contractor had left open for unfinished drain work. The Board found by three votes to two that the flood was caused by the sewer and not by the installation work, so the surrounding property cover did not pay.

Whatever the dispute is about, the first steps after damage matter. After damage on site, do not start repairs before the insurer has had a chance to inspect the damage. Propping, shutting off water and covering the works are steps to take at once.

The most common mistake we see is a contractor who goes beyond those immediate steps and starts the repair before the insurer or its loss adjuster has inspected the damage. Sometimes the damaged parts, or the part that caused the damage, are thrown away. The insurer then cannot investigate the cause. Because the insurer has the right to inspect the damage, the claim can be left unpaid on that ground alone. Photograph the damage and the steps you took. Keep the removed parts until the insurer has seen them. If the insurer has already refused the claim, you can book a free consultation and we will go through the refusal with you.

Exclusions

Defective workmanship and other exclusions

Construction all risk insurance does not pay for repairing a part of the works that was done wrong or made of defective material, even when the cause is a design or calculation error. It can pay for sudden damage that the defect causes to other insured property.

Finnish wordings generally follow this rule, although some draw the second half more narrowly. Pohjola’s wording, for example, pays for damage to other insured property only when the defect first causes a sudden mechanical breakage and the insured did not know, and should not have known, about the defect.

The dispute is usually about where the defective part ends. Insurers often argue that the defective part extends to the whole stage of work whose parts depend on each other. The Insurance Complaints Board has agreed in several cases.

In VKL 49/13 the formwork was assembled against the formwork plan and gave way during a concrete pour. The contractor argued that only the props were defective and that the concrete and reinforcement were sound property damaged by the defect. The Board found that the formwork, reinforcement, concrete and pouring formed one concreting job, so repairing all of it was repairing the defective part.

VKL 604/15 went the same way for a building services contractor whose pipework in a cellar collapsed because of several installation errors. The whole pipeline was one installation.

When the error was made by an outside designer, the contractor’s extra costs caused by the design error can instead become a claim against the designer, which the designer’s professional indemnity insurance may pay if the designer is liable.

FINE-0019832017

A steel sheet pile wall holding open X Oyj’s excavation sank because of an error in its design and construction. Its ground anchors loosened. Compensation was sought from X Oyj’s own construction all risk insurance. The dispute was whether the anchors were sound property or part of the defective wall.

Lesson

The wall and its anchors formed one structure, so the new anchors and the replacement wall were repair of a design defect. The monitoring measurements made while stopping the movement were paid as costs of limiting the damage, but removing the support berm afterwards was not.

Partly paid

When the insurer relies on this exclusion, explain technically why the damaged part is separate from the defective one. In these Board cases, a part that had no purpose of its own outside the defective structure was treated as part of it.

Other common exclusions in Finnish construction wordings
  • Gradual damageWear, corrosion, rot, mould and other damage that develops slowly.
  • Unexplained lossesProperty that has gone missing, or a theft whose time and place cannot be established, for example one found only at a stocktake.
  • Blasting, piling and quarryingDamage caused by blasting or the ground movement it causes is excluded in several wordings.
  • Groundwater and floodsSome wordings exclude damage caused by a change in the groundwater level. Wordings treat floods from lakes, rivers or the sea in three ways. Some exclude them, some cover them only when exceptional and some only when caused by storm wind.
  • Weather damage to property outsideDamage by natural forces to loose property left outside or in an open building, unless the property is meant to be stored there.
  • Damage covered by someone else’s guaranteeThe policy does not pay as far as a supplier or someone else is liable for the damage under a contract or guarantee.

The site safeguards (suojeluohjeet) are part of the insurance contract. They require, for example, a written hot work plan or permit and a hot work licence for the worker, protection of water pipes against freezing and locking loose tools and materials away after the working day. If the insured neglects a safeguard intentionally or through negligence that cannot be regarded as minor, and the neglect affected the damage, the insurer can reduce or refuse the claim.

Time and money

Delay in completion, liquidated damages and lost profit

Construction all risk insurance usually does not pay for delay in completion. When damage on site pushes back the handover, the liquidated damages, the lost profit and the extra site costs stay with the contractor unless a separate cover has been bought.

The Finnish wordings insure physical damage to property, so consequential losses such as loss of income and the contractor’s profit margin are left out of the loss. The wordings do not mention liquidated damages as a covered cost either.

The cover that comes closest to dealing with delay is expediting costs. Overtime, temporary installations and urgent deliveries needed to repair the damaged works can be insured in some wordings, for example LähiTapiola’s, Turva’s and Pohjola’s, but only when the cover is written in the schedule. Expediting costs do not replace the lost profit, but they can shorten the delay.

Delay in start-up (DSU) insurance, also called advance loss of profits (ALOP), pays the financial loss caused by a delay that follows insured damage. Finnish insurers do offer it, but usually not for small projects. Where it is offered for one, the cost is usually out of proportion to the risk. A contractor whose own business stops after a fire at its yard or element factory needs business interruption insurance (keskeytysvakuutus) instead.

Plant

Contractors plant and equipment insurance

Contractors plant and equipment insurance covers the machines a contractor uses on site. In Finland mobile plant needs a policy of its own. Construction all risk insurance covers tools, scaffolding, formwork and small machines only when they are written in the schedule.

The construction wordings exclude registered and self-propelled plant. The exact line varies. Fennia’s wording, for example, excludes motor-driven plant such as excavators, Pohjola’s excludes mobile plant, lifts and cranes, and LähiTapiola’s and Turva’s exclude registered machines and self-propelled machines over 5 kW. Excavators, wheel loaders and mobile cranes are therefore insured under a separate contractors plant insurance (työkonevakuutus). Pohjola, for example, sells it as an own damage cover for the machine, similar to comprehensive car insurance (kasko).

Tools and smaller equipment can be added to the construction policy. When they are, the cover is often narrower than for the works. For example, the breakage cover in LähiTapiola’s and Turva’s wordings pays for tools and site huts only after a fall, an overturn or another outside cause. The wordings also apply a deduction for age. Equipment left outside or stolen from a vehicle carries a higher deductible in several wordings. Some wordings exclude theft from a vehicle altogether.

Names

Builders risk, CAR and contract works – what the names mean in Finland

Builders risk insurance, construction all risk insurance (CAR) and contract works insurance are names for the same kind of cover. In Finland they all mean rakennus- ja asennustyövakuutus.

The names are used in different places:

  • builders risk in the United States
  • contract works insurance in Britain and Australia
  • CAR in international projects
  • erection all risk (EAR) for installing machines and equipment

Finnish insurers sell all of them as one policy, so a foreign client’s request for builders risk insurance is answered with a Finnish construction and installation policy. The Finnish wordings usually insure physical damage only, so a contract clause that also asks for cover of delay or financial loss needs a separate extension. When a contract written abroad asks for a named cover, compare the clause with the Finnish wording and the schedule before you sign.

Policy type

Annual or single project policy

Construction all risk insurance is available as an annual policy that covers the projects listed in the policy schedule, at its widest all of the contractor’s projects, or as a single project policy for one contract.

An annual contract works policy suits a contractor with many similar and fairly small jobs. It usually covers the work included in the turnover declared to the insurer, so a new job does not need its own policy. The schedule usually sets a maximum value per contract. A contract above that value must be insured separately with a single project policy. Some wordings, for example LähiTapiola’s and Turva’s, also count the subcontracts and the equipment bought by the client in the value.

A single project policy is written for one site and one contract price. It suits large contracts and contracts that the annual policy does not reach. If the contract says so, the client can take it out itself.

Changes and additional work can push a contract over the annual policy limit while it is running. The policy in the following case did not say what happens then.

FINE-67122-N2B1K2025

X Oy’s annual construction policy covered contracts up to one million euros. A tunnel drilling job grew through costly extra work. Protective pipes buckled while the gap between them was later filled with concrete. Compensation was sought under X Oy’s own construction insurance. The dispute was whether the damage happened during an insured contract.

Lesson

Damage during the original contract falls within the insured contract even if extra work later lifts the price over the limit. The grouting was a new contract below the limit, so the Board found it insured and recommended that the insurer reconsider the claim under the other terms.

Claim to be reconsidered

Keep written offers and order confirmations for additional work. In this case the Board relied on them to tell one contract from another. The contractor bore the burden of proof for what had been agreed.

Policy wordings

Contractors all risk insurance from four Finnish insurers

The contractors all risk policy wordings of Fennia, LähiTapiola, Turva and Pohjola share the main rules but differ in surrounding property, expediting costs, deductibles and the guarantee period.

Construction all risk insurance · 4 wordings

Where the wordings differ

All four exclude the repair of defective parts and exclude mobile or registered plant from the construction policy.

Insurer
Surrounding property
Other rules
Fennia
Only if agreed
Parts of a renovated building outside the contract are not insured unless added to the schedule. Covers the client and subcontractors in the wording itself. Guarantee period up to two years from the accepted handover inspection. Expediting costs are not counted in the loss. Fire, storm and leak damage to a building under construction carries a deductible of 10 percent, at least 3,000 € and at most 30,000 €, when the unfinished work affected the damage. The schedule can set higher amounts.
LähiTapiola
Up to 10,000 € included
Separate single project and annual wordings. Named covers plus breakage cover. Expediting costs if added. Guarantee period up to three years from handover. Extra deductible for hot work fires, leaks before a pressure test and property outside.
Turva
Up to 10,000 € included
Same wordings as LähiTapiola.
Pohjola
Only if agreed, on a first-loss basis
Cover not limited to named perils. On a first-loss basis the damage is paid up to the agreed amount, without a reduction for underinsurance. Damage to other insured property from a defect only after a sudden mechanical breakage. Expediting costs if agreed. Guarantee period up to three years, with damage in that period capped at 10 percent of the sum insured. Hot work fire deductible ten times the agreed deductible, up to 20,000 €.

The surrounding property rule matters most in renovation. Where a wording includes some cover, a small renovation contract has cover for the existing building even without an extension, although 10,000 euros does not go far if a ceiling below has to be rebuilt. Where it does not, the parts of the building outside the contract have no cover from the construction policy unless an endorsement for it is in the schedule.

Your schedule can change the sum insured, the deductibles and the extensions, so read it before you rely on any wording. An independent insurance broker in Finland can check whether your current policy covers the existing property in your renovation contracts and compare the cover with other insurers.

Price

How much does construction all risk insurance cost – getting a builders risk quote

There is no general price level for construction all risk insurance, because the premium is set for each contractor and project. A builders risk insurance quote is based on the type and value of the contract and on how the insurer sees the risk.

For example, the following factors can affect the premium:

  • the type of contract, such as new building, renovation or installation
  • the contract price of a single project, or for an annual policy the yearly turnover and the maximum value per contract
  • how long the contract lasts
  • the deductible you choose
  • the fire class of the building
  • your claims history

For a quote on an annual policy, have the average contract value, the number of contracts in a year, their usual length and the value of your largest contract ready. For a single project, the contract price, the timetable and a description of the work are the starting point. When asking for the quote, tell the insurer if the site includes an existing building that needs surrounding property cover, because the cover has to be agreed before any damage happens.

Questions

Questions about construction all risk insurance in Finland

Construction all risk insurance covers the guarantee period only in part. After handover the wordings cover damage caused by guarantee repairs and, in most of them, damage caused by an error made during construction. The period is two or three years depending on the insurer. The cover applies only when no other insurance or guarantee pays.

Contractors all risk insurance is for building work and erection all risk insurance for installing machines and equipment. In Finland both are one policy, construction all risk insurance. The difference shows mainly in when the cover ends, at handover for a building and at handover or the start of production use after the test run for a machine.

General liability insurance usually does not cover damage to the works. General liability insurance in Finland pays damage your company causes to others when it is liable, but the wordings usually exclude property your company is working on. Damage to the works belongs to construction all risk insurance.

The client can take out the construction insurance if the contract says so. Under YSE 1998 without changes the main contractor insures, but the parties can agree otherwise. Check that the policy covers every contractor working on the site, so that no part of the works is left uninsured.

The deductible on a construction all risk policy is agreed with the insurer and written in the policy schedule. A higher deductible lowers the premium. Several wordings add an extra or higher deductible, for example for fires caused by hot work. LähiTapiola’s and Turva’s wordings also add one for leaks before the pipes have been pressure tested and for property kept outside.

Construction all risk insurance covers stolen tools only if they are written in the policy schedule. Most wordings also require a break-in to a locked space or the breaking of a locked fastening. They also exclude thefts whose time and place cannot be established.

Has your insurer refused a construction claim?

Send us the refusal letter, the contract and the policy schedule. We will read them against the wording and tell you whether the damaged property was part of the works, whether the defect exclusion was applied correctly and which of your policies should pay. Where the refusal does not hold, we challenge it with the insurer and, if needed, before the Insurance Complaints Board or the court.

Our fees: a single tender from 4,000 euros, ongoing broking from 5,000 euros a year. The fee is fixed and never a share of the premium. What the fee includes

BOOK A FREE CONSULTATION →